Skip to content
rPResiliencePilot

Risk Intelligence

Risk that does the work, not a register that rots

Most tools hand you a register and leave it to go stale. ResiliencePilot finds the risks, scores them your way, and keeps them true, connected to the assets, suppliers, incidents and continuity behind them, with rAIley doing the heavy lifting.

app.resiliencepilot.no
ResiliencePilot risk register: total risks, critical/high count, status breakdown and risks by category.

The difference

A register anyone can build. Keeping it true is harder.

Plenty of tools auto-calculate a risk score and call it done: a black box you can’t shape, blind to control effectiveness and to what’s actually driving the risk. Risk owners need a method they control and a picture that reflects reality.

Most tools

Auto-calculate a score you can’t adjust, then leave the register to drift out of date.

Risk Intelligence

Your 5×5 method, the controls cutting inherent to residual, the assets and suppliers behind each risk, and rAIley’s recommended treatment.

What’s inside Risk Intelligence

Enterprise and third-party risk, on one connected model

Find risks, not just record them

rAIley surfaces risks from a plain-English description of a process or asset and sharpens the write-up, and you decide what enters the register.

Score it your way

A configurable 5×5 model with inherent and residual scoring that reflects the effectiveness of your controls: your methodology and appetite, not a fixed black box.

Third-party & vendor risk

Tier vendors, send AI-reviewed due-diligence questionnaires, score them across five dimensions, track certifications, and build your DORA Article 30 Register of Information.

Treat it, and hold the line

Mitigate, transfer, accept or avoid, with approvals on the big calls, actions tracked to closure, and a risk appetite that flags what crosses it.

Connected, so it stays true

Risk links to the assets, suppliers, controls, incidents and continuity behind it, so when a single point of failure appears, it becomes a risk you can see and own.

Your posture at a glance

Heatmaps, top risks by score and severity breakdowns, plus audit-ready risk reports for ISO 27001, DORA and NIS2.

rAIley drafts the risk work. You make the call.

It surfaces risks from context, recommends controls, proposes treatment plans and reviews third-party questionnaires against the evidence. Suggestions are advisory and audit-logged; what enters your register is your decision.

Built in the EU, native to your regulation

Operational and ICT third-party risk mapped to DORA and NIS2, with your data hosted in the EU, not retro-fitted onto a US compliance tool.

Frequently asked questions

Is the risk score a black box?
No. You configure the 5×5 model, thresholds and appetite, and the residual score reflects the effectiveness of the controls you link: your methodology, auditable end to end.
Does it cover third-party / vendor risk?
Yes. Vendor tiering, AI-reviewed due-diligence questionnaires, a five-dimension supplier score, certification tracking and the DORA Article 30 Register of Information, all linked to your risk register.
What does rAIley actually do here?
rAIley identifies risks from a description, sharpens write-ups, recommends mitigating controls, drafts treatment plans and reviews supplier questionnaires against the evidence: advisory, audit-logged, and always yours to approve.
Is risk connected to the rest of the platform?
Yes. Risk shares data with assets, suppliers, controls, incidents and business continuity, so your register reflects what's actually happening instead of drifting out of date.

Risk connects to business continuity, governance & compliance and DORA third-party obligations.

See Risk Intelligence on your data

See it on your own data and frameworks, with your security and data-residency questions answered.